Recent bathroom remodeling jobs — drag to compare
Bathroom — Full Remodel, Tile & Vanity
BeforeAfter
Drag the handle — or use the arrow keys — to slide between before and after.
What clients said
"Responsive, prompt, and professional. Ed's team handled our bathroom remodel flawlessly from start to finish. Highly recommend."
"Best contractor experience we've had. Committed to quality — no shortcuts, honest pricing, communication was excellent throughout."
Springfield bathrooms are small, and they were built that way
Almost every bathroom we remodel in Springfield started life as a five-by-seven or five-by-eight room, because that is what houses here were built with. One bathroom, upstairs, tucked wherever the plumbing stack happened to run. A cast iron tub, a window instead of a fan, and tile that was set when the house was new.
That size is not usually the real problem. A small bathroom laid out well feels fine. What causes trouble is everything that was added to it over eighty years — a vanity that blocks the door swing, a shower surround glued over the original tile, a radiator exactly where the storage should go.
Most of our Springfield bathroom jobs are not about making the room bigger. They are about making the same square footage work properly.
What comes out of the wall with the old tile
In a house from the 1920s through the 1950s, opening up a bathroom wall tends to reveal the same short list:
- Galvanized supply lines. Seventy years of mineral buildup narrows them to the width of a pencil. If your water pressure upstairs has quietly got worse, this is usually why. Replacing the runs while the wall is open costs a fraction of doing it later.
- Cast iron drain stacks. Often still sound, sometimes not. We look before quoting rather than after.
- No ventilation at all. Original bathrooms were vented by opening the window, which nobody does in a Springfield January. That is where the peeling paint and the black corners come from.
- Subfloor damage around the toilet. Slow leaks go unnoticed for years. It is common, it is fixable, and it needs to be priced before the tile is ordered.
Tub out, shower in
The single most requested bathroom job in Springfield is taking out the old cast iron tub and putting in a walk-in shower. Sometimes that is a style choice. More often someone in the house has decided that stepping over a fourteen-inch tub wall every morning is no longer worth it.
It is a straightforward conversion when the drain stays put: tub out, waterproofing in, new pan, new tile, new door. It gets more involved when the drain has to move, because that means opening the floor and working on the stack below.
If this is about staying in the house comfortably for the long run, say so at the first visit. Blocking for grab bars costs almost nothing while the wall is open and is a real job once the tile is on. The same goes for a bench, a handheld on a slide bar, and a curbless entry.
Second bathroom, or a half bath downstairs
A lot of Springfield houses still have exactly one bathroom. Adding a half bath on the first floor is one of the few projects that genuinely changes daily life in an old house, and it is usually less disruptive than people expect — a closet, the space under the stairs, or a corner of the back hall is often enough.
The deciding factor is almost never the space. It is how far the new fixtures are from an existing stack, and whether a vent can be run. We check that first, because it is the difference between a reasonable job and an expensive one.
Permits, plainly
Replacing a vanity, retiling, or swapping fixtures in the same positions generally does not need a building permit. Moving plumbing does, and a plumbing permit is pulled by the licensed plumber doing that part of the work. New circuits or a new exhaust fan on its own circuit need an electrical permit, pulled the same way.
You will hear which permits your job needs before you sign anything. If it needs none, we will say that too.
How the work goes
Site visit
Measurements, what is behind the walls, what the layout allows.
Written estimate
Line-item PDF within 48 hours.
Order + schedule
Deposit, tile and fixture order, and a start date you can plan around.
Build + finish
Daily cleanup, daily progress, final walk-through together.
Nearby towns we work in
Springfield is our home ground, and the towns around it run on the same schedule and the same pricing — West Springfield, Chicopee, Longmeadow, East Longmeadow, Agawam, Holyoke, and 13 more.
More on the work itself: bathroom remodeling across Western MA and everything we do in Springfield. Often booked alongside flooring and drywall and painting. Worth reading first: what a bathroom remodel actually costs in Western MA and the signs it is time.
FAQ
Can you convert our tub to a walk-in shower?
Yes, and it is the job we are asked for most often in Springfield. If the drain stays where it is, it is a clean conversion — tub out, waterproofing, new pan, tile and door. If the drain has to move, the floor gets opened and the work reaches the stack below, which we price separately so you can see the difference.
Our water pressure upstairs is weak. Is that fixable during the remodel?
Usually, and it is the right time to do it. In houses of this age the original galvanized supply lines silt up until they are barely open. Replacing those runs while the wall is already open costs a fraction of what it costs as its own job later.
There is no fan, just a window. Does that need fixing?
It does. Original Springfield bathrooms were vented by opening the window, which nobody actually does in winter, and that trapped moisture is what causes the peeling paint and dark corners. A properly ducted fan vented outside solves it, and it is cheap while the ceiling is open.
Can we add a half bath on the first floor?
Often yes. The space is rarely the obstacle — a closet or a corner of the back hall is usually enough. What decides it is how far the new fixtures sit from an existing stack and whether a vent can be run, so that is the first thing we check.
How long will the bathroom be out of use?
A straightforward remodel is one to two weeks on site. Tile and waterproofing have cure times that cannot be rushed, so we give you the day-by-day sequence in writing and tell you which days the room is genuinely unusable.